TNPCB Various Vacancies 242 Posts updated on 22nd September 2023

The Tamilnadu Prevention and Control of Water Pollution Board was comprised by the Government of Tamilnadu on twenty seventh day of February, Nineteen eighty two (27-2-1982) in compatibility of the Water (Prevention and Control of Pollution) Act, 1974 (Central Act 6 of 1974).

The Board was later renamed as Tamilnadu Pollution Control Board (TNPCB) in the year 1983. It authorizes the arrangements of the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986 and the standards made under these Acts, which incorporates.

The Water (Prevention and Control of Pollution) Act, 1974

The Tamilnadu Water (Prevention and Control of Pollution) Rules, 1983.

The Air (Prevention and Control of Pollution) Act, 1981

The Tamilnadu Air (Prevention and Control of Pollution) Rules, 1983.

The Environment (Protection) Act, 1986

The Environment (Protection) Rules, 1986

Production, Storage and Import of Hazardous Chemical Rules, 1989

Fly Ash Utilization Notification 1999

The Batteries (Management and Handling) Rules, 2001

The Environment Impact Assessment Notification, 2006

The Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016

The Bio-Medical Waste Management Rules, 2016

The Solid Waste Management Rules, 2016

The Plastic Waste Management Rules, 2016

The E-Waste Management Rules, 2016

The Construction and Demolition Waste Management Rules, 2016

Tamil Nadu Pollution Control Board (TNPCB), was built up on 27.2.1982. It capacities with Head Office at Chennai, 7 Zonal workplaces and 38 District workplaces. The Board office is going by the Chairman, Zonal workplaces are going by the Joint Chief Environmental Engineers, and the 38 District workplaces are going by District Environmental Engineers. Two flying crews are additionally working at Erode and Tiruppur which are going by the Environmental Engineers.

To aid the Analytical and Scientific side, the Board has built up 8 Advanced Environmental Laboratories, 8 District Environmental Laboratories.

TNPCB is actualizing the Pollution Control Legislations and Rules and Notifications confined in that. In releasing the obligations endowed to it, the Board explores, gathers and disperses information identifying with water, air and land contamination, sets down benchmarks for sewage/exchange gushing and outflows.

TNPCB issues agree to new businesses in two phases. Agree to build up is given relying on the reasonableness of the site before the business takes up the development exercises and agree to work is given after establishment of contamination control quantifies by the unit to fulfill the measures.

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *